For DOT & roadway contractors
The right-of-way, asset by asset — inspected, repaired, documented.
Signs, signals, culverts, catch basins — inspection-and-repair work orders pin to the actual asset on live GIS. Photos burn in GPS and timestamp at capture, restoration tracks to closeout, and the safety file builds job by job instead of the night before the audit.
The daily grind
A knockdown comes in as a text, a blurry photo, and a milepost guess
The culvert has been 'on the list' three seasons and nobody can prove it was ever inspected
The state asks for work-zone safety records and the answer is three binders and a glovebox


How LineMaps runs it
Work orders pinned to the asset, not a milepost guess
Inspection and repair tickets attach to the actual sign, signal, or culvert on the map. Dispatch sees what the crew sees, the app works where county roads have no bars and syncs later, and every repair stacks onto that asset's history — so 'when was this last touched' has an answer.
Photos that survive a records request
Every field photo burns in timestamp and GPS at capture — before, during, after, attached to the work order. Restoration tracking rides the same ticket, so disturbed shoulder and seed-and-mulch punch items get closed instead of remembered.
Work-zone safety, already on paper
Work-type JSAs, toolbox talks, and incident reports log against the site as the crew works, and TRIR comes off actual clock-in hours. When the state wants your work-zone safety story, you pull the record — you don't reconstruct it.
Quantities logged at the closeout photo
Signs set, feet of guardrail, culverts cleaned: units logged at completion hit your rate card automatically. Payroll-ready timesheets, and no month-end forensics on the foreman's dash.
On the map
Your assets, drawn as themselves.
Distinct icons and route styles per asset type, photographed and attributed in the field on live geospatial data — with as-built review and redlines when the build doesn't match the print.
- Signs
- Traffic Signals
- Pavement Issues
- Guardrail
- Striping
- Culverts
- Ditches
- Catch Basins & Inlets
- How many crews to clear the culvert backlog before freeze-up?
- What does a two-day standby on the shoulder actually cost?
- Self-perform the guardrail runs or sub them out?
One shared crew-and-production model — enter a rate once, every answer agrees.
Run your own numbers — free, in your browserPut your dot & roadways work on one platform.
LineMaps goes live December 16, 2026. Every plan includes the whole platform, sized to your operation, and a real person who's built infrastructure reads every request, usually same-day.