For cities, districts & co-ops
Every utility you own, on one map — with the history attached.
Water, sewer, storm, roads — electric or fiber if you've got it. One live map with per-utility symbology, work orders pinned to real assets, and the dashboard the board actually asks for. Sized for the shop where five people run everything.
The daily grind
Water lives in one system, sewer in another, and storm drainage is a paper map two people can read
Thirty years of which-valve-sticks knowledge retires with the foreman in June
The council asks for response times; the answer is a week of spreadsheet archaeology


How LineMaps runs it
Four utilities, one map
Water, sewer, storm, and roads — plus the electric or fiber system if you own one — each with its own symbology on the same live map. As-built and redline review keeps the map right after the repair, not just after the next GIS contract.
Asset history that doesn't retire
Every work order pins to the actual hydrant, valve, or lift station, with photos stamped with time and GPS. The valve that sticks and the manhole that surcharges every spring stay on the asset record — not in one foreman's head.
Dashboards the council can read
Exec dashboards pull straight from the work orders the crew closes: open work, response times, and CIP tracking on the capital plan. Budget night stops being a scavenger hunt through three departments' spreadsheets.
Residents get a text, not a voicemail box
Customer portals send tracking links and texts, so the resident who reported the hydrant sees the status without calling city hall. Dispatch pins the job to the asset, and the field app works past the edge of cell coverage — it syncs when the truck does.
On the map
Your assets, drawn as themselves.
Distinct icons and route styles per asset type, photographed and attributed in the field on live geospatial data — with as-built review and redlines when the build doesn't match the print.
- Hydrant
- Valve
- Water Main
- Manhole
- Lift Station
- Catch Basin
- Culvert
- Traffic Signal
- How many crews finish the main replacement before paving season ends?
- Replace the culverts with our own guys or bid it out?
- What does the water crew actually cost per week?
One shared crew-and-production model — enter a rate once, every answer agrees.
Run your own numbers — free, in your browserPut your municipals & co-ops work on one platform.
LineMaps goes live December 16, 2026. Every plan includes the whole platform, sized to your operation, and a real person who's built infrastructure reads every request, usually same-day.