Skip to contentLineMaps goes live Dec 16, 2026Join the waitlist

For telecom contractors

Run the whole FTTH build — staking sheet to closeout.

LineMaps was born on aerial fiber. Strand, lash, splice, drops — phase-tracked on live GIS, with dispatch, safety, and the invoice coming off the same record the crew logs at the pole.

Pole 1047Make-ready cleared
Splice case SC-12144 fibers tested
Crew 4 on site1,240 ft lashed today
212 Cedar Hollow RdDrop live, invoiced

The daily grind

Route progress lives in a spreadsheet that was stale before lunch

811 locates age out quietly and temp drops never convert

Month-end billing means reconstructing the build from texts and photo rolls

Lineman in a bucket truck working a pole line at first light
Aerialfirst light
Lineman climbing a wooden pole above a tracked utility vehicle
Aerialon the pole

How LineMaps runs it

Phase-tracked aerial construction

Strand, lash, splice, drops — staged phases per route that progress in order, so dispatch and the customer see the same build state the field does.

Make-ready and pole transfers

Make-ready worksheets and pole-transfer tracking live on the same poles the crew photographs; as-built review and redlines close the loop.

Units at the pole become the invoice

Footage and units logged at completion hit your rate card automatically, with payroll-ready timesheets and no month-end reconstruction.

CIP & BEAD grant builds

Grant-build tracking rides the same map as construction, so compliance reporting comes from the record of work instead of a second system.

On the map

Your assets, drawn as themselves.

Distinct icons and route styles per asset type, photographed and attributed in the field on live geospatial data — with as-built review and redlines when the build doesn't match the print.

  • Poles
  • Strand / Lash
  • Splice Closures
  • Handholes & Vaults
  • Drop Terminals
  • MSTs
  • Conduit & Duct
  • Aerial & Underground Drops
Questions the toolkit answers
  • How many crews finish this build by the deadline?
  • What does this crew cost per foot, per week?
  • Self-perform the drops or sub them out?

One shared crew-and-production model — enter a rate once, every answer agrees.

Run your own numbers — free, in your browser

Put your telecom & ftth work on one platform.

LineMaps goes live December 16, 2026. Every plan includes the whole platform, sized to your operation, and a real person who's built infrastructure reads every request, usually same-day.