For water & sewer contractors
Run the whole water job — locate ticket to pay app.
Mains, hydrants, meters, manholes, lift stations — each on live GIS with its own symbology, work orders pinned to the actual asset, and the municipal pay app coming off the same units the crew logs at the trench.
The daily grind
The as-built for the 1965 cast iron main lives in a retired operator's head
Cuts get paved back late, and the city notices before you do
The monthly pay app means rebuilding installed footage from paper tickets and truck-window math
How LineMaps runs it
Locates aged before the bucket hits dirt
Every dig against a 60-year-old main starts with a live ticket. 811 locates age on the dispatch board — expired reads 'do not dig, renew first,' expiring gets flagged days ahead — so a dead ticket shows up in dispatch, not in the trench.
Restoration that closes, not lingers
Flag restoration when the ticket completes and a follow-up record spawns, tied to the work order. It sits on the pending board until the crew closes it out — and pave-back photos carry burned-in GPS and timestamp. The city engineer gets proof, not promises.
Meter change-outs as work orders
A 4,000-meter change-out is 4,000 work orders pinned to real meters on the map. Crews scan the new meter out of the warehouse, photograph the swap at the pit, and close the record on the spot — offline if the pit has no signal, synced when it does.
Municipal billing from the trench up
Footage of main, each valve, each service reconnect logged at completion hits your contract rate card. Payroll-ready timesheets, and a pay app the city can trace back to the asset.
On the map
Your assets, drawn as themselves.
Distinct icons and route styles per asset type, photographed and attributed in the field on live geospatial data — with as-built review and redlines when the build doesn't match the print.
- Water Mains
- Hydrants
- Valves
- Water Meters
- Manholes
- Lift Stations
- Gravity Mains
- Force Mains
- How many crews to change out 4,000 meters by the contract date?
- What does this main crew cost per foot, per week?
- Overtime or a third crew before the paving moratorium?
One shared crew-and-production model — enter a rate once, every answer agrees.
Run your own numbers — free, in your browserPut your water & wastewater work on one platform.
LineMaps goes live December 16, 2026. Every plan includes the whole platform, sized to your operation, and a real person who's built infrastructure reads every request, usually same-day.