Skip to contentLineMaps goes live Dec 16, 2026Join the waitlist

For network owners

Own the record, not the contractor's word for it.

Accept or flag every asset a contractor touched before it becomes your as-built. Approve production before it gets priced, watch the build move phase by phase, and keep inspecting the plant long after closeout.

Map

12CREWFOOTAGE

What you're on the hook for

  • The as-built record — accurate, current, and defensible to an engineer or an auditor
  • What a contractor invoices, and whether the units behind it were actually built
  • The plant after closeout — inspections, permits, warranty calls, and the subscriber asking when service arrives

The daily grind

As-builts arrive months late as a PDF, and nobody can say which redlines made it into the drawings

When the invoice lands, the contractor's footage is the only number in the room

Make-ready stalls on poles nobody can name while the permit clock keeps running

How LineMaps runs it

Your record, accepted one asset at a time

Open an As-Built Review session over what the contractor touched — features updated in the last 7 days, or every feature in the project — and accept or flag each one under your name; flagging prompts for what changed and writes a redline on that feature, and the full redline carries change type (relocated, footage changed, spec changed), planned versus as-built value — 1,200 ft to 1,350 ft — and stays open until you mark it incorporated into the drawings. Design vs As-Built sorts every planned run into matched, not-yet-built, or built-but-never-designed, with planned length, as-built length and max deviation per run, and every feature keeps a field-level history of who changed what and what it said before.

Nothing gets priced until you approve it

Units crews log as performed land in the Production Approval queue grouped by work order with the running dollar value attached — approve them, or reject with a required reason — and the gate is a database trigger, not a screen: a unit cannot be born accepted, and once it is accepted its quantity, code and billable flag are locked against edits. The invoice draft pulls only accepted, billable units and says in plain text how many are still awaiting approval, how many were excluded as rejected or non-billable, and which have no catalog rate yet.

Watch the build by phase, not by phone call

Strand, lash, down guy/anchor, splice, MST, drop, home install — Phase Progress rolls every feature up to its furthest complete phase and shows exactly which segments are unblocked for the next crew, and where a job is split into phases the prerequisite gate is enforced in the database, with the override recorded on the phase that used it. Make-Ready lists every pole still blocking, the outstanding make-ready cost, which attacher owns each attachment and which permits expire inside 14 days; the closeout scorecard hard-blocks on features still not built, poles still needing make-ready and expired 811 locates, and flags open redlines and locates about to age out.

The half a contractor tool never covers

"Inspect every splice closure annually" is a maintenance schedule — interval, checklist, required certifications, estimated hours — and due tickets generate daily or on demand with the checklist and certs stamped on them. The closure itself keeps 1–5 condition inspections with defects and a next-due date, photo QC verifications, its fiber-by-fiber splice matrix and OTDR pass/fail; customers link to the service-address feature, so opening one shows every ticket ever logged at that address, and a completed home install carries a warranty window any callback ticket can be linked back to.

A day on LineMaps.

  1. 7:00 AM

    Every contractor on one map

    Progress across the build is on one live map, colored by status, whichever crew is doing the work.

  2. 10:00 AM

    As-builts while they are fresh

    Redlines and field photos land on the asset they describe, so review happens the same week, not at closeout.

  3. 1:00 PM

    Evidence before you pay

    Each invoice line traces back to the ticket, the GPS stamp and the photos behind it.

  4. 3:30 PM

    Customers stop calling

    Public tracking links show build status by address, so “when is it done” answers itself.

  5. 5:00 PM

    The network record is current

    What got built today is on the map tonight, attributed and photographed.

One job, three seats.

Everyone works the same record. Each person sees the part that is theirs, and pay and pricing stay with the people who should see them.

Job
WO-2214, underground drop
Status
Complete, ready to invoice
Units
2 lines, priced from your rate card
Evidence
4 photos, GPS, tech sign-off
Invoice
Draft INV-0412, Net 30

Owners and admins see priced amounts. Nobody else does unless you turn it on for them.

Sample data

Shipping today

Not a roadmap. A record.

Everything below is live in the platform now — running on one shared record, so the number in the report is the number the crew logged.

  • As-built accept / flag sessions
  • Production approval gate
  • Field-level feature history
  • Make-ready & permit expiry
  • BEAD & CIP reporting
  • Project export — CSV, KML, JSON
Questions the toolkit answers
  • How many crews does it take to hit the in-service date we committed to?
  • Build the drops with our own techs or contract them — after supervision, QC and rework?
  • At the footage we're actually getting, where does this build land at completion?
Run your own numbers — free, in your browser

Your utilities

Symbology and workflows per utility.

See it on your operation.

LineMaps goes live December 16, 2026. Join the waitlist to hear first, or tell us what you're running and we'll walk through exactly what LineMaps takes off your plate. A real person who's built infrastructure reads every request.