For contractors
Win the bid, hit production, get paid.
Projects, crews, production, materials, safety and billing in one system, built for the outfit that swings the hammer. Priced before you sign, billed off units somebody actually reviewed.
Billing
What you're on the hook for
- The number on the bid. If the rate doesn't cover the crew you'd have to field, nobody else catches it.
- Production per crew per day, and the cost per foot that falls out of it.
- A safety record that clears prequal and a billing package the utility doesn't kick back.
The daily grind
Crews self-report quantities, the quantities go straight to an invoice, the utility rejects them, and you're another 45 days out on money already spent.
A truck rolls with a lapsed cert, a stale DVIR, or material that isn't at the yard. That's a full day of crew burn nobody bills.
You find out the job went upside down at close-out, when the only thing left to do is write it up.
How LineMaps runs it
Know what the rate can afford before you sign it
Bid Rate & Margin works backward from the customer's $/ft against the weekly crew you'd actually field and calls an unaffordable unit rate before the proposal goes out. All 15 calculators run on one forecasting engine, so change the supervisor rate once and the crew comparator, the deadline backsolver and the cash-flow model all move with it.
Nothing rolls that's going to get turned around
The pre-dispatch readiness check answers whether the ticket can actually go out: crew assigned, certs unexpired, vehicle inspection inside seven days, planned units coverable by on-hand stock, start time set, no open blocking ticket. Certifications flag 30 days before expiry, construction phases gate the sequence — make-ready before mainline, mainline before splicing — with the prerequisite enforced server-side, and the production log takes end-of-day crew footage and reads pace against the build target.
Close-out evidence the utility takes the first time
The completion wizard is configured per work type and utility, so each customer's packet gets captured the way that customer wants it, and the safety step will not advance until the JSA is acknowledged and every PPE item is confirmed. Participants acknowledge the briefing by name with the time recorded, the whole thing queues offline and replays when signal comes back, and one tap builds the evidence pack as a PDF with an audit footer on every page.
Units get reviewed, then billed
Field-logged units sit as performed until a reviewer holding billing.units.accept takes them or bounces them back with a reason — a crew can't accept its own, and a database trigger enforces that on insert, update and delete. The billing export prices only accepted units off the unit catalog and stamps billed_at so a billed ticket drops out of the next export, while material is charged at the point of use with a billable flag and reel footage draws down per pull, so Job Cost reads real labor and material against what the ticket actually billed.
A day on LineMaps.
6:30 AM
Crews open their day
Each tech sees today’s tickets on the map, with the prints, the 811 status and the client’s checklist already on the ticket.
9:00 AM
Safety on the record
Weather, lightning and the nearest ER show up on the ticket. One tap acknowledges it, with name, time and GPS saved.
12:30 PM
Production as it happens
Footage and units are logged on the ticket, so the foreman sees the day’s numbers without a phone call.
3:00 PM
The client checks in without calling
Your client opens their read-only map link and sees the finished work and its photos for themselves.
5:30 PM
The day becomes the invoice
Completed units roll into weekly production, priced from your rate card, with the evidence ready to attach.
One job, three seats.
Everyone works the same record. Each person sees the part that is theirs, and pay and pricing stay with the people who should see them.
- Job
- WO-2214, underground drop
- Status
- Complete, ready to invoice
- Units
- 2 lines, priced from your rate card
- Evidence
- 4 photos, GPS, tech sign-off
- Invoice
- Draft INV-0412, Net 30
Owners and admins see priced amounts. Nobody else does unless you turn it on for them.
Sample data
Shipping today
Not a roadmap. A record.
Everything below is live in the platform now — running on one shared record, so the number in the report is the number the crew logged.
- 15 live planning calculators, one engine
- Unit approval gate before anything bills
- Crew can't accept its own units
- Pre-dispatch readiness check, 6 checks
- JSA + PPE gate on the safety step
- Reel footage logged per pull
- The customer's rate is $6.80 a foot. What crew does that actually pay for, and what's left as margin?
- Fixed completion date. More overtime or another crew, which one lands it cheaper?
- How deep does the cash hole get before the first check clears, and what week does this job turn?
Your utilities
Symbology and workflows per utility.
See it on your operation.
LineMaps goes live December 16, 2026. Join the waitlist to hear first, or tell us what you're running and we'll walk through exactly what LineMaps takes off your plate. A real person who's built infrastructure reads every request.