Skip to contentLineMaps goes live Dec 16, 2026Join the waitlist

For municipalities & utilities

Answer the council with data, not memory.

Water, sewer, storm, roads, gas, electric and telecom on one map, in one record system, run by one small staff. Inspections and failure history sit on the individual asset; permits, recurring maintenance and the capital plan sit above them in the same system.

Work Orders

FTTH Install — Sample Address
INSTALL · AERIAL DROP · EST 2.5 HR
IN PROGRESS
ONT LEVELS
SIGNATURE
UNITS LOGGED IN THE FIELD→ INVOICE

What you're on the hook for

  • Every mile of pipe, road and structure the town owns — with a crew of six
  • A capital plan the council goes through line by line
  • What happens in the first 48 hours after the storm

The daily grind

The system lives in one foreman's head, and he retires in March

Records are split between a consultant's shapefile, a filing cabinet and three spreadsheets

Council asks how long a main break takes to fix and the honest answer is a guess

How LineMaps runs it

Seven utilities, one record system

Hydrants, valves, water meters, manholes, cleanouts, lift stations, catch basins, outfalls, culverts, ditches, road segments, streetlights, signs, easements and ROW lines are already drawable, recordable types — pick a utility and its tools surface first, without locking any of the others out. Bring the consultant's shapefile, the engineer's DXF or a KML in layer by layer, reprojected from any of 327 NAD83 State Plane and UTM zone presets, and take everything back out as CSV, KML or a full-organization JSON export whenever you want.

The program survives the retirement

"Inspect every lift station quarterly" stops being something one person remembers and becomes a maintenance schedule that generates the ticket on its own, with the checklist and required certs already stamped on it. Inspections land on the individual asset with a 1–5 condition score, pass/fail and findings — routine, post-storm, pre-construction, complaint-driven or regulatory — and every asset carries a change history showing who edited which field, from what value to what value, including when its location or shape moved.

The CIP, the permits and the regulatory list

Capital projects sort by fiscal year and P1–P5 priority, showing approved versus spent against each one, the funding source named, and a PDF export for the packet. ROW, DOT and easement permits warn 30 days before expiry with the permit document attached to the record, and recurring compliance items each carry a regulation ref and next due date into a compliance rate you can trend on the analytics board.

After the storm, and the week after that

Crews mark damage as geography — a storm-damage line down one stretch, a damage area over a subdivision, ride-out inspection zones, repair-needed points — and each failure gets logged on the asset itself with date, failure mode and severity. Pull the actual high, low, precipitation and wind for that date onto a delay record, and when someone asks how fast you responded, the response-time report gives average hours to assign, dispatch and complete by work type, plus the ten slowest tickets.

A day on LineMaps.

  1. 7:00 AM

    A resident reports a problem

    The request becomes a work order on the asset, a hydrant, a valve, a sign, with the photo they sent.

  2. 9:30 AM

    The closest crew gets it

    Dispatch sees crews on the map and sends it to whoever is nearest, with the asset’s history attached.

  3. 12:00 PM

    Inspected and photographed

    The crew closes it out in the field, offline if they have to, and the record syncs when signal returns.

  4. 3:00 PM

    Grant reporting without the scramble

    CIP and BEAD tracking reads from the same record, so the report is a filter, not a project.

  5. 5:00 PM

    The council packet writes itself

    Dashboards show work done, response times and spend from the same data the crews entered.

One job, three seats.

Everyone works the same record. Each person sees the part that is theirs, and pay and pricing stay with the people who should see them.

Job
WO-2214, underground drop
Status
Complete, ready to invoice
Units
2 lines, priced from your rate card
Evidence
4 photos, GPS, tech sign-off
Invoice
Draft INV-0412, Net 30

Owners and admins see priced amounts. Nobody else does unless you turn it on for them.

Sample data

Shipping today

Not a roadmap. A record.

Everything below is live in the platform now — running on one shared record, so the number in the report is the number the crew logged.

  • 1–5 condition score per asset
  • Permit expiry warning at 30 days
  • Shapefile / DXF / KML, 327 CRS presets
  • CIP by fiscal year, PDF export
  • Field work queues offline
  • 10 roles, per-project membership
Questions the toolkit answers
  • How many crews to finish the sewer rehab before paving starts in September?
  • Run it with our own crew, hire local, or bid it out — which actually costs less?
  • Three rain weeks in, where does this project land at completion?
Run your own numbers — free, in your browser

See it on your operation.

LineMaps goes live December 16, 2026. Join the waitlist to hear first, or tell us what you're running and we'll walk through exactly what LineMaps takes off your plate. A real person who's built infrastructure reads every request.